SNS Project Team wrote another legend in the logistics sector as undertaking classifying, labelling, packing and loading of steel units for the crushing plant to be built in Sweden. 14,000 pieces of steel were received from various suplliers in different locations of Turkey, placed in the warehouse and classified and labelled one by one. Then groups were packed with precise work and stuffed for loading to the vessel. All packing materials, frames, chassis, crates, pallets and boxes were made by SNS. Pieces consisted of over length of 20 meters and width of 4.5 meters. Total cargo was over 4,500 frt. All phases were done by SNS Project Team on job-site with ultimate care and effort.