EL MERK PROJECT LOGISTICS / ALGERIA

SNS is handling logistics of movement of steel pipes from South Korea which are to be used for El Merk Central Processing Facility (CPF) Project in the Berkine Basin of Algeria. The El Merk Central Processing Facility will serve as a production hub for the region, processing hydrocarbons initially from Block 208, operated by the Sonatrach/Anadarko Association, and from the unitised EMK field located on a portion of both Block 208 and the Sonatrach/Conoco Phillips operated Block 405a. The combined nominal capacity of the initially installed processing facilities will be 98,000 barrels of oil per day, 29,000 barrels of condensate per day, and 31,000 barrels of liquefied petroleum gas (LPG) per day together with an NGL train with a nominal capacity of 600 million standard cubic feet per day. The CPF will also include 500 million standard cubic feet of residue and re-injection gas compression and approximately 80,000 barrels per day of produced water treatment and re-injection facilities.

 powered by Netkolog All Rights Reserved ©2018 SNS International Transport & Foreign Trade LTD